Shanghai Richeng Electronics Co. Ltd - ISO9001/IATF16949/ISO/TS22163
Choose Language

Wiring duct,Cable Gland,Cable Tie,Terminals,RCCN

Simulation to improve the scope of automotive wiring harness

The practical application shows that using the designed vehicle wiring harness system greatly improves the efficiency and quality of the art design. Compared with the technical design, the efficiency is improved by more than 50%, and the calculated error rate is zero.

In the automotive wiring harness design pneumatic connectors, because different models of automotive connector models, the standard is not uniform, the socket body slot shape, spring probe arrangement, spring push pin installation location can be customized according to the actual needs of users . The design of harness testing station base requirements are: to achieve detection of open circuit, short circuit, on-resistance function, display error conditions and their location, with versatility. On this basis, strive to improve the detection efficiency, proud to the interface is clear, easy to operate.

The storage form is matrix. At this point the storage is "path key point" level. Judge whether the conditions to meet the termination of the operation, if satisfied, then continue to the next step, if not satisfied with the return step after the bin operation. The termination condition of the calculation is that the current key point is the ending point. According to the space attitude of the active wiring harness, the process of moving the automobile wiring harness is displayed dynamically, and the "path key points" stored in the "Path Key Points" list in the "Path" are sequentially read. After reading a "path key point", the coordinates of each node on the active wire harness at this time are obtained from the node list data in the "path key point", and the nodes are sequentially connected and displayed on the output device by using Bezier curve fitting, At the same time delete the display of the key point of the previous path. When all the key points of all the paths are displayed in sequence, the complete simulation of one path is completed.

Related articles

Previous: New energy vehicles overcapacity now signs
Next: Why are the prospects of the distributed photovoltaic industry still promising?
On-line
contact
message
download
Print
WeChat WeChat
Collection
TOP