Shanghai Richeng Electronics Co. Ltd - ISO9001/IATF16949/ISO/TS22163
Choose Language

Wiring duct,Cable Gland,Cable Tie,Terminals,RCCN

Harness processing plant wiring harness processing problems

Harness processing problems Harness factory wiring harness is overhead only outdoor, so in winter, the surface can easily be covered with some ice or snow, and if the weight of the ice exceeds the capacity of the car wiring harness, It will be easy to cause the car wiring harness to pull down the power transmission tower, or pull down the power pole, there may be a car wire harness itself collapsed situation. If you encounter such a situation, how to solve it? Harness processing plant to tell you mainly from the following points to solve:

1: If the harness is a harder conductor, it will not spin easily when there is more snow, and the snow will automatically fall off the conductor. At the same time, because the harness density is not enough Large, when the snow gradually solidified, to a certain extent will automatically break up, in such circumstances, high-voltage overhead automotive wiring harness came into being.

2: In the choice of materials above, you can choose to be able to withstand cold car wiring harness. Because the snow and ice fall on the car wiring harness or the gap between the wiring harness, the center of gravity of the car wiring harness will be offset, causing the car wiring harness to rotate while the snowball is getting bigger and bigger, Therefore, the car wiring harness is the main cause of the harness is broken.

3: Wire harness factory recommends applying the antifreeze coating on the car wire harness, and the so-called antifreeze coating is a kind of high temperature thermal insulation coating, or reflective thermal insulation coating, mainly through the heat to achieve antifreeze In addition, antifreeze paint in addition to antifreeze, but also has moisture, water, insulation, anti-corrosion and anti-crack and so on.

Related articles

Previous: Motor industry reshuffle period approaching
Next: New energy vehicles forced charging pile construction speed!
On-line
contact
message
download
Print
WeChat WeChat
Collection
TOP